Guide · Schemes

# PM Surya Ghar: Muft Bijli Yojana 2026: Subsidy, Eligibility and How to Apply

India's rooftop solar scheme for homes: up to Rs 78,000 central subsidy, support for housing societies, low-cost loans and the national portal. What you get, who qualifies, and the steps from application to subsidy.

On this page

- What the scheme offers
- Who can apply
- How to apply, step by step
- Getting the most from a home system
- Where Arrays Ingenieria fits
- Frequently asked questions
- Sources

By the [Arrays Ingenieria engineering team](https://arraysingenieria.com/about/) · Updated 11 Oct 2026 · 3 min read

**Key takeaways**

- Central subsidy: **Rs 30,000 for 1 kW, Rs 60,000 for 2 kW, Rs 78,000 for 3 kW or more**
- Housing societies and RWAs get **Rs 18,000 per kW** for common facilities, up to 500 kW
- Approved by the Cabinet on 29 February 2024 with an outlay of **Rs 75,021 crore**; the government's target is 75 lakh households by December 2026, on the way to 1 crore
- Modules must be Indian-made (DCR), installed by a registered vendor, and the application made on the national portal
- Many states add their own top-up subsidy; check your DISCOM

## What the scheme offers

**PM Surya Ghar: Muft Bijli Yojana** was launched by the Prime Minister on 13 February 2024 and approved by the Union Cabinet on 29 February 2024 with an outlay of **Rs 75,021 crore**. It aims to put rooftop solar on one crore homes so that each can generate up to about 300 units a month, and the government's milestone is **75 lakh households by December 2026**.

Central financial assistance under PM Surya Ghar

| Category | Support | Notes |
| --- | --- | --- |
| Homes, 1 kW | Rs 30,000 | 60% of benchmark cost for the first 2 kW |
| Homes, 2 kW | Rs 60,000 |  |
| Homes, 3 kW or more | Rs 78,000 (cap) | 40% of the additional cost between 2 and 3 kW; no extra subsidy above 3 kW |
| Housing societies / RWAs (common facilities, EV charging) | Rs 18,000 per kW | Up to 500 kW, at 3 kW per house |
| Special category states and UTs | Higher benchmark support where notified | Including the North-Eastern states |

**Rs 78,000**Maximum central subsidy per home

**1 crore**Homes targeted

**Rs 75,021 cr**Scheme outlay

**~300 units**Free power a month, the aim

## Who can apply

- An Indian household with its own roof suitable for solar panels
- A valid electricity connection in the household's name
- No earlier central subsidy for rooftop solar on the same connection
- Housing societies and RWAs for common loads, through the society

## How to apply, step by step

- **Register**On the national portal (pmsuryaghar.gov.in) with your state, DISCOM, consumer number and mobile number.
- **Apply**Fill in the rooftop solar application; the DISCOM checks feasibility.
- **Choose a registered vendor**Pick a vendor registered with your DISCOM; agree capacity and price.
- **Install**The vendor installs the system with DCR modules and a compliant inverter.
- **Net meter and inspection**Submit plant details, apply for the net meter; the DISCOM inspects and commissions.
- **Subsidy**After the commissioning certificate is generated on the portal, submit bank details; the subsidy is credited to your account.

Collateral-free loans of around 7% are available from public-sector banks for residential systems up to 3 kW, and the portal links to lenders. Model solar villages in each district receive additional support.

## Getting the most from a home system

- Size to your consumption: a 3 kW system typically generates around 12 units a day in most of India, depending on sunshine and orientation.
- Use a shade-free, south-facing area where you can; avoid water tanks and parapets casting shadows.
- Ask for the DCR module certificate, inverter BIS certificate and warranty documents.
- Keep the panels clean: dust can cut output noticeably in dry months (see [O&M and module cleaning](https://arraysingenieria.com/solar-om-module-cleaning/)).

## Where Arrays Ingenieria fits

PM Surya Ghar is a scheme for homes and housing societies. Arrays Ingenieria focuses on commercial, industrial and tea-estate plants, which fall outside it, and on installation & commissioning for developers. For businesses, the equivalent levers are [accelerated depreciation](https://arraysingenieria.com/accelerated-depreciation-solar/), the [5% GST rate](https://arraysingenieria.com/gst-on-solar-india/) and [net metering](https://arraysingenieria.com/net-metering-india/) or [open access](https://arraysingenieria.com/green-energy-open-access/).

Running a business, school, hospital or housing society with a large roof? We can design a plant that pays back fast.

[Get a free solar quote](https://arraysingenieria.com/free-solar-quote/)

## Frequently asked questions

How much subsidy do I get under PM Surya Ghar?

Rs 30,000 for 1 kW, Rs 60,000 for 2 kW and Rs 78,000 for 3 kW or more. Housing societies get Rs 18,000 per kW for common facilities up to 500 kW.

Can a business get the PM Surya Ghar subsidy?

No. The scheme is for residential households and housing societies. Businesses benefit instead from accelerated depreciation, 5% GST and net metering or open access.

Do I need Indian-made panels?

Yes. Systems under the scheme must use domestically manufactured (DCR) modules and be installed by a vendor registered with your DISCOM.

How long does the subsidy take?

After installation, inspection and net-meter commissioning, the commissioning certificate is generated on the portal and the subsidy is paid to your bank account, typically within weeks.

## Sources

- [PIB, 29 Feb 2024: Cabinet approves PM Surya Ghar: Muft Bijli Yojana](https://pib.gov.in/PressReleasePage.aspx?PRID=2010133)
- [PIB: 75 lakh households targeted for rooftop solar by December 2026](https://www.pib.gov.in/PressReleasePage.aspx?PRID=2268992)
- [PM Surya Ghar national portal](https://pmsuryaghar.gov.in/)

This guide explains public policy in plain language for planning purposes. Rules, rates and deadlines change: confirm the current position with the notifying authority, your DISCOM and your tax adviser before you commit. Last checked 11 Oct 2026.

**About the authors.** Arrays Ingenieria is an ex-servicemen-led solar EPC and installation & commissioning company working Pan-India, from Assam's tea estates to industrial rooftops. [Our story](https://arraysingenieria.com/ex-servicemen-led-msme/) · [Our projects](https://arraysingenieria.com/projects/)

[Rooftop Solar](https://arraysingenieria.com/service-rooftop/)[CAPEX Solar EPC](https://arraysingenieria.com/capex-solar-epc/)

From Our Sites

## Case Studies on This Topic

Real plants our veteran-led crews have built, with the scope of work in detail.

[On-Grid · I&C: **1711.66 kWp On-Grid Solar PV Project, Assam**1711.66 kWp · AssamRead the case study](https://arraysingenieria.com/project-assam-1711kwp-on-grid-solar/)

Keep Reading

## Related Guides

[Policy: **ALMM List-I and List-II Explained: The Made-in-India Rule for Solar Modules and Cells**MNRE's Approved List of Models and Manufacturers now covers solar cells as well as modules. What List-I and List-II mean, which projects they bind, the exemptions, and how to stay compliant.3 min read · Updated 11 Oct 2026](https://arraysingenieria.com/almm-list-ii-solar-cells/)[Grid & Regulation: **Net Metering in India (2026): Net Billing, Gross Metering, ToD Tariffs and the Draft 2026 Rules**How your solar plant connects to the DISCOM and how exported units are paid for: net metering, net billing and gross metering, the 500 kW rule, time-of-day tariffs, the draft 2026 amendments, and the step-by-step approval process.3 min read · Updated 11 Oct 2026](https://arraysingenieria.com/net-metering-india/)[Schemes: **PM-KUSUM in 2026: Components A, B and C, New Deadlines and What Comes Next**India's farm solar scheme: up to 2 MW plants on farmers' land, standalone solar pumps and solarised feeders. What each component offers, the 2026 deadline extensions, and the proposed PM-KUSUM 2.0.3 min read · Updated 11 Oct 2026](https://arraysingenieria.com/pm-kusum-scheme/)

[All solar guides](https://arraysingenieria.com/insights/)[Government solar schemes](https://arraysingenieria.com/solar-schemes-india/)