# Borpatra (Barpatra) Tea Estate: 230 kWp On-Grid Solar Plant

A 230 kWp on-grid ground-mount solar plant at Goodricke Group's Borpatra (Barpatra) Tea Garden in Borhat, Sivasagar, Assam, formally inaugurated by the estate manager, Satish Pandey, on 25 September 2026.

The Project

## About the Borpatra Tea Estate, Assam project

The plant is part of the 3.11 MW commercial & industrial solar programme for Goodricke's estates, developed jointly by Tata Power Renewable Energy Ltd. and Sustvest, with Arrays Ingenieria as the turnkey implementation partner.

Arrays Ingenieria obtained the net-metering and statutory approvals from Assam Power Distribution Company Ltd. (APDCL), including technical inspection by the Namrup SDE and the APDCL Dibrugarh TRD department, so the plant could start on schedule.

Borpatra brought the company's count to 19 on-grid solar plants in Assam's tea gardens, as reported in the Hindi press on 25 September 2026.

Under its motto "Olive Green to Go Green", Arrays Ingenieria brings military-grade discipline and engineering precision to building critical clean-energy infrastructure. For its team of veterans, working in renewable energy is a "second innings of national service", contributing directly to sustainable nation-building.

### Our scope of work

- Turnkey implementation of the ground-mount plant
- Net-metering and statutory approvals with APDCL
- Grid connection
- Testing and commissioning

### In the news

[News channel: **Sonari Live**Exclusive: 230 kW solar project launched at Borpatra tea garden](https://arraysingenieria.com/recognition/#sonari-live)[News channel: **News Axom**A new era of solar power at Borpatra tea garden: 230 kW project launched](https://arraysingenieria.com/recognition/#news-axom)[Newspaper: **Dainik Purvoday**26 Sep 2026230 kW solar plant starts at Barpatra Tea Estate](https://arraysingenieria.com/recognition/#barpatra-230kw)[Newspaper: **Northeast Chronicle**27 Sep 2026230 kWp solar plant successfully commissioned at Borpatra tea estate](https://arraysingenieria.com/recognition/#northeast-chronicle-borpatra)[Newspaper: **Prerna Bharati**26 Sep 2026230 kW solar plant starts at Borpatra Tea Estate; 19 on-grid solar plants in Assam so far](https://arraysingenieria.com/recognition/#prerna-bharati-borpatra)[Newspaper: **Purvanchal Prahari**26 Sep 2026230 kW solar project starts at Borpatra tea garden](https://arraysingenieria.com/recognition/#purvanchal-prahari-borpatra)[Newspaper: **Swarajati**27 Sep 2026Arrays Ingenieria starts a 230 kWp on-grid solar project at Assam's Borpatra tea garden](https://arraysingenieria.com/recognition/#swarajati-borpatra)[Newspaper: **Dainik Janambhumi**27 Sep 2026On-grid solar project at Borpatra tea garden: a step towards cutting carbon emissions](https://arraysingenieria.com/recognition/#dainik-janambhumi-borpatra)[Newspaper: **Janambhumi (online)**26 Sep 2026230 kWp on-grid solar project begins at Borpatra tea garden](https://arraysingenieria.com/recognition/#janambhumi-online-borpatra)[Newspaper: **Niyomiya Barta**27 Sep 2026On-grid solar project begins at Borpatra tea garden](https://arraysingenieria.com/recognition/#niyomiya-barta-borpatra)

### Photos

## Project facts

Capacity: **230 kWp**

Plant type: **Ground-mount, on-grid (net-metered)**

Location: **Borhat, Sivasagar district, Assam**

Client: **Borpatra Tea Garden, Stewart Holl (India) Ltd. (Goodricke Group)**

Partner / programme: **Tata Power Renewable Energy Ltd. & Sustvest (3.11 MW programme)**

Our role: **Turnkey implementation partner**

Year: **2026 (commissioned September 2026)**

## Planning a similar project?

Talk to our veteran-led team about EPC, installation & commissioning or civil works.

[Get a Free Quote](https://arraysingenieria.com/free-solar-quote/)

Why It Matters

## Driving the PM's Panchamrit and Assam's green-energy goals

By cutting reliance on fossil fuels in the energy-intensive tea-processing sector, the Borpatra solar installation contributes to Prime Minister Narendra Modi's "Panchamrit" climate commitments, announced at COP26: 500 GW of non-fossil capacity and half of India's energy needs from renewables by 2030, and net zero by 2070.

It also advances Assam Chief Minister Dr Himanta Biswa Sarma's target of 6,000 MW of installed green-energy capacity by 2030. The project shows that sustainable innovation and clean energy can drive the next chapter of Assam's economic growth story.

Sources: [PM's national statement at COP26, PIB, 1 Nov 2021](https://pib.gov.in/PressReleasePage.aspx?PRID=1768712); [Himanta Biswa Sarma, Rewriting Assam's Energy Future, 22 Sep 2026](https://himantabiswa.substack.com/p/rewriting-assams-energy-future).

Photo Album

## The Inauguration in Pictures

7 photos from the inauguration at Borpatra Tea Estate, 25 September 2026. Tap any photo to view it full size.

Official poster for the inauguration of the 230 kWp ground-mounted on-grid solar power plant at Borpatra Tea Estate, 25 September 2026: Tata Power Solar, Goodricke, Sustvest and Arrays Ingenieria (installation partner)

Inauguration of the 230 kWp Borpatra Tea Estate solar plant, 25 September 2026: the team at the banner and AC distribution board, Arrays Ingenieria (ex-servicemen-led) installation partner

Borpatra Tea Estate gate with the banner for the inauguration of the 230 kWp ground-mounted on-grid solar power plant, 25 September 2026, Tata Power Solar, Goodricke, Sustvest and Arrays Ingenieria

Puja at Inverter-2 of the 230 kWp Borpatra Tea Estate solar plant before the inauguration, installed by Arrays Ingenieria

Inauguration banner beside the AC distribution board (ACDB) of the 230 kWp Borpatra Tea Estate solar plant, Arrays Ingenieria

Borpatra Tea Estate manager at the AC distribution board on inauguration day, 230 kWp solar plant by Arrays Ingenieria

Solar modules of the 230 kWp ground-mounted on-grid plant at Borpatra Tea Estate, Assam, installed by Arrays Ingenieria (Ingenieria), ex-servicemen-led MSME

Documents

## Orders, Certificates & Press

The documents behind this case study. Tap to view full size.

Goodricke certificate of appreciation: installation & commissioning of the 230 kWp plant at Borpatra Tea Garden

Northeast Chronicle, 27 Sep 2026

Dainik Purvoday, 26 Sep 2026

Prerna Bharati, 26 Sep 2026

Purvanchal Prahari, 26 Sep 2026

Swarajati, 27 Sep 2026

Dainik Janambhumi, 27 Sep 2026

Janambhumi (online), 26 Sep 2026

Niyomiya Barta, 27 Sep 2026

Listed in Tata Power / TPREL media monitoring, 27 Sep 2026

Related

## Services Used on This Project

[Installation & Commissioning](https://arraysingenieria.com/solar-installation-commissioning/)[EPC Turnkey](https://arraysingenieria.com/service-epc/)[Solar for Tea Estates](https://arraysingenieria.com/solar-for-tea-estates/)[All Projects →](https://arraysingenieria.com/projects/)

More Case Studies

## Other Projects by Arrays Ingenieria

[Tea Estate · Inaugurated by the CM: **Koomber Tea Estate: 595 kWp Solar Plant, Inaugurated by the Chief Minister of Assam**595 kWp · Koomber Tea Garden, Silchar, Cachar district (Barak Valley), AssamRead the case study](https://arraysingenieria.com/project-koomber-tea-estate-595kwp-solar-cm-inauguration/)[Tea Estate · Ground-Mount: **Jay Shree Tea: 1 MW Solar at Towkok & Manjushree Tea Estates**1035 kWp (535 + 500 kWp) · Sonari, Charaideo district, AssamRead the case study](https://arraysingenieria.com/project-jayshree-tea-1mw-solar-assam/)[Tea Estate · Ground-Mount: **Orangajuli Tea Estate: 450 kWp Ground-Mount Solar Plant**450 kWp · Orangajuli, Panerihaat, Udalguri district, AssamRead the case study](https://arraysingenieria.com/project-orangajuli-tea-estate-450kw-solar/)