title: 1940 kWp Solar, Dewan Group Tea Estates | Arrays Ingenieria
description: Case study: supply of BOS plus installation & commissioning of 1940 kWp of ground-mount solar at Dewan, Burtoll and Labac tea estates, Cachar, Assam.
url: https://arraysingenieria.com/project-dewan-group-tea-estates-1940kwp-solar-assam/
last_updated: 2026-11-14
source: Arrays Ingenieria (Arrays Ingenieria Pvt. Ltd.)
---

Case Study · Tea Estates · Ground-Mount I&C

# Dewan Group of Tea Estates: 1940 kWp Ground-Mount Solar

Three ground-mounted, on-grid solar plants, 1940 kWp in all, for the Dewan Group of Tea Estates of Jay Shree Tea & Industries (BK Birla Group) in Cachar, Assam: 735 kWp at Dewan, 620 kWp at Burtoll and 585 kWp at Labac.

The Project

## About the Jay Shree Tea, Cachar, Assam project

Arrays Ingenieria worked as the implementing partner of Tata Power Renewable Energy Ltd. (TPREL). The work order is dated 25 June 2025; the scope covered supply of the balance of system along with installation & commissioning of the 1940 kWp grid-connected solar power generation system.

Work began on 9 October 2025 and was completed on 8 January 2026, the commissioning date. In its work completion certificate of 22 January 2026, the Dewan Group of Tea Estates confirms that the plants are fully operational, have been taken over, and that performance has been verified and found to meet the agreed standards, to the complete satisfaction of the Dewan Group and TPREL.

Jay Shree Tea also issued a certificate of appreciation for each plant, citing Arrays Ingenieria's professionalism in installation and commissioning: "Their competence is indeed praiseworthy." This was the second Jay Shree Tea solar project for Arrays Ingenieria, after the 1035 kWp at Towkok and Manjushree.

### Our scope of work

- Supply of balance of system (BOS)
- Installation of the ground-mount plants at three estates
- Testing and commissioning of the 1940 kWp grid-connected system
- Handover to the Dewan Group and TPREL

### In the news

[Client post: **Jay Shree Tea & Industries Ltd.**24 Nov 2025Solar for the Dewan Group of Tea Estates: Dewan, Labac & Burtoll](https://arraysingenieria.com/recognition/#jayshree-dewan)

## Project facts

Capacity: **1940 kWp (735 + 620 + 585 kWp)**

Plant type: **Ground-mounted, on-grid (three plants)**

Location: **Dewan, Burtoll and Labac Tea Estates, P.O. Dewan, Cachar district, Assam 788102**

Client: **Jay Shree Tea & Industries Ltd. (BK Birla Group), Dewan Group of Tea Estates**

Partner / programme: **Tata Power Renewable Energy Ltd. (TPREL)**

Our role: **Implementing partner of TPREL: supply of balance of system, installation & commissioning**

Year: **2025-26 (commissioned 8 January 2026)**

## Planning a similar project?

Talk to our veteran-led team about EPC, installation & commissioning or civil works.

[Get a Free Quote](https://arraysingenieria.com/free-solar-quote/)

Project Timeline

## How the Project Unfolded

The work, stage by stage, as it was ordered and delivered.

-

25 Jun 2025

### Work order

Work order for BOS supply and installation & commissioning of 1940 kWp.

-

9 Oct 2025

### Work begins

Installation starts across Dewan, Burtoll and Labac Tea Estates.

-

8 Jan 2026

### Commissioned

All three plants completed and commissioned; performance verified.

-

22 Jan 2026

### Completion certificate

Dewan Group confirms handover to its complete satisfaction and TPREL's.

On Site

## Challenges and How We Handled Them

### Three estates, one schedule

Dewan (735 kWp), Burtoll (620 kWp) and Labac (585 kWp) were built and commissioned together in three months, from 9 October 2025 to 8 January 2026.

### Documented completion

A work completion certificate and three certificates of appreciation from the client record the result, plant by plant.

Installation & Commissioning

## What Our I&C Scope Covered

The standard ground-mount installation & commissioning scope we deliver to EPC majors' specifications, after the mandatory quality and safety training and contractor safety sign-off.

### Civil works

- Earth-pit chambers and covers (RCC/PCC)
- Foundations for inverters, ACDB, ITB and accessories
- Cable trenches
- Cube tests to validate concrete strength

### Mechanical

- Module mounting structure installation
- Module installation and interconnection
- Canopies for wall-mounted inverters and junction boxes

### DC side

- String wiring from modules to inverters, tagged and identified
- DC cables in conduit or tray
- MC4 connectors crimped male and female
- Array junction boxes

### AC side and protection

- Inverters and inverter terminal boxes
- AC distribution board (ACDB)
- LT AC cables in trays to the approved layout
- Reverse power relays installed and commissioned

### Earthing and lightning

- Earth electrodes and pits
- Earthing strips for structures, inverters and ACDB, including welding
- Lightning arrestors

### Monitoring and cleaning

- Data monitoring system (SCADA / power manager)
- Module cleaning system with pump and motor
- DWC pipe for RS485 communication cable

### Safety and handover

- Safety lines and safety posters
- Material unloading, storage under covers and care until handover
- Third-party validation of tools where required
- Testing, commissioning and handover

[The Full Commissioning Checklist](https://arraysingenieria.com/solar-plant-commissioning-checklist/)[Our I&C Service](https://arraysingenieria.com/solar-installation-commissioning/)

Documents

## Orders, Certificates & Press

The documents behind this case study. Tap to view full size.

Jay Shree Tea certificate of appreciation: 735 kWp, Dewan Tea Estate

Jay Shree Tea certificate of appreciation: 620 kWp, Burtoll Tea Estate

Jay Shree Tea certificate of appreciation: 585 kWp, Labac Tea Estate

Related

## Services Used on This Project

[Installation & Commissioning](https://arraysingenieria.com/solar-installation-commissioning/)[Ground-Mount Solar](https://arraysingenieria.com/service-ground-mount/)[Solar for Tea Estates](https://arraysingenieria.com/solar-for-tea-estates/)[All Projects →](https://arraysingenieria.com/projects/)

More Case Studies

## Other Projects by Arrays Ingenieria

[Tea Estate · Inaugurated by the CM: **Koomber Tea Estate: 595 kWp Solar Plant, Inaugurated by the Chief Minister of Assam**595 kWp · Koomber Tea Garden, Silchar, Cachar district (Barak Valley), AssamRead the case study](https://arraysingenieria.com/project-koomber-tea-estate-595kwp-solar-cm-inauguration/)[Tea Estate · Ground-Mount: **Jay Shree Tea: 1 MW Solar at Towkok & Manjushree Tea Estates**1035 kWp (535 + 500 kWp) · Sonari, Charaideo district, AssamRead the case study](https://arraysingenieria.com/project-jayshree-tea-1mw-solar-assam/)[Tea Estate · Ground-Mount: **Orangajuli Tea Estate: 450 kWp Ground-Mount Solar Plant**450 kWp · Orangajuli, Panerihaat, Udalguri district, AssamRead the case study](https://arraysingenieria.com/project-orangajuli-tea-estate-450kw-solar/)