# Harmutty Tea Estate: 400 kWp Ground-Mounted Solar Plant

Installation and commissioning of the 400 kWp ground-mounted, on-grid solar power plant at Goodricke's Harmutty Tea Estate in Laluk, North Lakhimpur, on the north bank of the Brahmaputra in Assam, inaugurated on 7 October 2026.

The Project

## About the Harmutty Tea Estate, Assam project

The plant was jointly developed by Tata Power Solar, Goodricke ("The Tea People") and Sustvest, the same partners behind the Goodricke tea-estate solar plants at Koomber, Orangajuli and Borpatra. Arrays Ingenieria was the implementing partner for installation and commissioning, as the inauguration banner records.

The 400 kWp array stands on fixed ground-mounted structures beside the tea bushes near Harmutty Tea Factory, feeding an AC distribution board that connects the plant to the estate's supply. The earthing pits are numbered and tagged with their test date and measured resistance, as we do on every plant, so the estate team can keep up the annual tests.

The plant was inaugurated on 7 October 2026, a week after the Chief Minister of Assam opened our Koomber plant. The inauguration banner sets it in the national and state context: supporting India's Solar Mission, advancing the Prime Minister's Panchamrit goals and contributing to Assam's green-energy growth vision.

Goodricke then presented Arrays Ingenieria with a certificate of appreciation for the installation and commissioning, acknowledging the team's professionalism, technical expertise and commitment, and its dedication, engineering excellence and meticulous approach throughout the execution of the project.

### Our scope of work

- Installation of the 400 kWp ground-mounted module mounting structures and modules
- DC cabling, inverters and the AC distribution board (ACDB)
- Earthing pits with tested and tagged resistance values
- Grid connection (on-grid) and testing
- Commissioning and handover for the inauguration on 7 October 2026

### Photos

## Project facts

Capacity: **400 kWp**

Plant type: **Ground-mounted, on-grid**

Location: **Harmutty, Laluk, North Lakhimpur district, Assam 784160**

Client: **Harmutty Tea Estate (Goodricke Group)**

Partner / programme: **Jointly developed by Tata Power Solar, Goodricke and Sustvest**

Our role: **Implementing partner: installation & commissioning**

Year: **2026 (inaugurated 7 October 2026)**

## Planning a similar project?

Talk to our veteran-led team about EPC, installation & commissioning or civil works.

[Get a Free Quote](https://arraysingenieria.com/free-solar-quote/)

Documents

## Orders, Certificates & Press

The documents behind this case study. Tap to view full size.

Goodricke certificate of appreciation: installation & commissioning of the 400 kWp ground-mounted on-grid plant at Harmutty Tea Estate

Related

## Services Used on This Project

[Installation & Commissioning](https://arraysingenieria.com/solar-installation-commissioning/)[Ground-Mount Solar](https://arraysingenieria.com/service-ground-mount/)[Solar for Tea Estates](https://arraysingenieria.com/solar-for-tea-estates/)[All Projects →](https://arraysingenieria.com/projects/)

More Case Studies

## Other Projects by Arrays Ingenieria

[Tea Estate · Inaugurated by the CM: **Koomber Tea Estate: 595 kWp Solar Plant, Inaugurated by the Chief Minister of Assam**595 kWp · Koomber Tea Garden, Silchar, Cachar district (Barak Valley), AssamRead the case study](https://arraysingenieria.com/project-koomber-tea-estate-595kwp-solar-cm-inauguration/)[Tea Estate · Ground-Mount: **Jay Shree Tea: 1 MW Solar at Towkok & Manjushree Tea Estates**1035 kWp (535 + 500 kWp) · Sonari, Charaideo district, AssamRead the case study](https://arraysingenieria.com/project-jayshree-tea-1mw-solar-assam/)[Tea Estate · Ground-Mount: **Orangajuli Tea Estate: 450 kWp Ground-Mount Solar Plant**450 kWp · Orangajuli, Panerihaat, Udalguri district, AssamRead the case study](https://arraysingenieria.com/project-orangajuli-tea-estate-450kw-solar/)