# Noida International Airport (YIAPL): 14.36 MW Solar, Piling & Fencing

Pile foundations and chain-link perimeter fencing for the 14.36 MW solar power project of YIAPL, the company building Noida International Airport in Uttar Pradesh.

The Project

## About the YIAPL, Uttar Pradesh project

In 2025 Tata Power Renewable Energy engaged Arrays Ingenieria for the construction of pile foundations (300 mm diameter, 1.8 m to 2.3 m deep) and for the supply, civil work and erection of chain-link fencing, with a tentative fence length of about 6.25 km, at the 14.36 MW YIAPL solar power project.

A plant of this size needs its foundations in and its perimeter secured before installation crews can move in.

### Our scope of work

- Pile foundations, 300 mm diameter, 1.8 m to 2.3 m deep
- Supply, civil work and erection of chain-link fencing (about 6.25 km tentative length)
- All manpower, machinery and material for the fencing

### Photos

## Project facts

Capacity: **14.36 MW**

Plant type: **Ground-mount, civil & fencing**

Location: **Noida International Airport, Gautam Buddh Nagar, Uttar Pradesh**

Client: **YIAPL (Yamuna International Airport Pvt. Ltd.)**

Partner / programme: **Tata Power Renewable Energy Ltd. (EPC)**

Our role: **Pile foundations, supply, civil works & fencing**

Year: **2025**

## Planning a similar project?

Talk to our veteran-led team about EPC, installation & commissioning or civil works.

[Get a Free Quote](https://arraysingenieria.com/free-solar-quote/)

Project Timeline

## How the Project Unfolded

The work, stage by stage, as it was ordered and delivered.

-

Mar 2025

### Pile foundations

Construction of pile foundations, 300 mm diameter, 1.8 m, 2 m and 2.3 m deep.

-

Jun 2025

### Chain-link fencing

Supply, civil work and erection of chain-link fencing, tentative length about 6.25 km.

On Site

## Challenges and How We Handled Them

### An airport site

Work at Noida International Airport runs under strict access and safety control, with every crew and vehicle accounted for.

### Kilometres of fence

Around 6.25 km of chain-link fencing means steady, surveyed progress: posts set in concrete, mesh tensioned, gates aligned.

### Piles to suit the ground

Three pile depths were used, matched to the ground conditions across the 14.36 MW site.

Related

## Services Used on This Project

[Civil Works & Fencing](https://arraysingenieria.com/service-civil/)[Ground-Mount Solar](https://arraysingenieria.com/service-ground-mount/)[All Projects →](https://arraysingenieria.com/projects/)

More Case Studies

## Other Projects by Arrays Ingenieria

[Industrial · Piling & Civil: **Tata Motors, Jamshedpur: Piling, Civil Works and I&C for 5.5 MW Solar**5.5 MW · Jamshedpur, JharkhandRead the case study](https://arraysingenieria.com/project-tata-motors-jamshedpur-5-5mw-solar-piling/)[Industrial · Civil Works: **DCM Textile, Hisar: Civil Works, Piling and I&C for Solar**9979 kWp (10 MW) · Hisar, HaryanaRead the case study](https://arraysingenieria.com/project-dcm-hisar-10mw-solar-civil-works/)[Utility-Scale · Piling: **SECI 300 MW Solar Project, Koppal: Piling and DC Installation**300 MW solar project · Koppal, KarnatakaRead the case study](https://arraysingenieria.com/project-seci-300mw-koppal-pile-foundation/)