title: Ground-Mount Solar Power Plants | Arrays Ingenieria
description: Utility and industrial ground-mount solar plants designed, built and commissioned across India by Arrays Ingenieria, from piling to grid connection.
url: https://arraysingenieria.com/service-ground-mount/
last_updated: 2026-10-11
source: Arrays Ingenieria (Arrays Ingenieria Pvt. Ltd.)
---

Solar EPC Service

# Ground-Mount Solar

Utility and industrial-scale ground-mount solar power plants - engineered for maximum generation and built to endure India's harshest terrains, from the deserts of Rajasthan to the tea gardens of Assam.

What We Do

## Ground-Mount Solar

Ground-mount solar is where Ingenieria's engineering pedigree truly shows. We handle the entire lifecycle - geo-technical survey, optimal tilt and row-spacing design, robust module mounting structures (MMS), DC/AC works and grid synchronisation - delivering plants that generate more, for longer.

Because our teams are drawn entirely from the armed forces, every site runs with military discipline: meticulous planning, strict safety protocols and uncompromising quality control at each milestone.

### Our Capabilities

- Site survey, soil testing & energy-yield modelling
- Hot-dip galvanised module mounting structures
- String & central inverter configurations
- DC/AC cabling, earthing & lightning protection
- Grid synchronisation & commissioning
- Performance testing & handover

### Proven Experience

We have delivered large-scale ground-mount installations including the **10 MW DCM Hisar** project in Haryana, **1 MW Jayshree Tea Estate** (Sonari, Assam) under a Tata Power EPC contract, **535 kWp Towkok** and **500 kWp Manjushree** tea-estate plants, and ground-mount works for **Tata Steel, Noamundi**.

#### At a Glance

Typical capacity: **100 kWp - 300 MW**

Structures: **HDG MMS, pile / pre-cast**

Scope: **EPC & balance-of-system**

Sectors: **Industrial, tea estates, utilities**

#### Planning a project?

Talk to our veteran-led team for a free, no-obligation consultation.

[Get a Free Quote](https://arraysingenieria.com/#contact)

FAQ

## Frequently Asked Questions

How much land is needed for a ground-mount solar plant?

Roughly 4 to 5 acres per MW, depending on module efficiency and layout. Ingenieria optimises tilt and row spacing to maximise generation on the available land.

What foundation types do you use for ground-mount solar?

Driven or rammed piles, bored piles, or pre-cast and RCC pedestals, selected from a site-specific geo-technical survey to suit your soil and wind loads.

What ground-mount capacities has Ingenieria delivered?

From sub-megawatt plants to pile foundations for the 300 MW SECI park at Koppal, plus the 10 MW DCM Hisar project and multiple tea-estate plants across Assam.

Who We Serve

## Sectors We Power

From a single home to a 300 MW utility park, we tailor solar to every sector across India.

### Residential

Rooftop solar for homes & housing societies, lower bills and energy independence, with PM Surya Ghar subsidy support.

#### Commercial

Offices, malls, hotels & fuel stations, slash operating costs and carbon with reliable clean power.

#### Industrial

Factories, smelters & manufacturing units, large rooftop and ground-mount systems built at scale.

#### Institutional

Schools, hospitals & campuses, compliant, dependable solar that funds itself over time.

#### Agriculture & Tea Estates

Ground-mount plants for estates & agri-loads, proven across Assam's tea gardens.

#### Government & PSU

Utility-scale & PSU projects (SECI, Tata Power EPC) executed exactly to specification.

On Site

## Project Gallery

A closer look at our work on the ground. Tap any image to enlarge.

Case Studies

## Projects Using This Service

[Tea Estate · Inaugurated by the CM: **Koomber Tea Estate: 595 kWp Solar Plant, Inaugurated by the Chief Minister of Assam**595 kWp · Koomber Tea Garden, Silchar, Cachar district (Barak Valley), AssamRead the case study](https://arraysingenieria.com/project-koomber-tea-estate-595kwp-solar-cm-inauguration/) [Tea Estate · Ground-Mount: **Jay Shree Tea: 1 MW Solar at Towkok & Manjushree Tea Estates**1035 kWp (535 + 500 kWp) · Sonari, Charaideo district, AssamRead the case study](https://arraysingenieria.com/project-jayshree-tea-1mw-solar-assam/) [Tea Estate · Ground-Mount: **Orangajuli Tea Estate: 450 kWp Ground-Mount Solar Plant**450 kWp · Orangajuli, Panerihaat, Udalguri district, AssamRead the case study](https://arraysingenieria.com/project-orangajuli-tea-estate-450kw-solar/) [Tea Estate · Ground-Mount I&C: **Harmutty Tea Estate: 400 kWp Ground-Mounted Solar Plant**400 kWp · Harmutty, Laluk, North Lakhimpur district, Assam 784160Read the case study](https://arraysingenieria.com/project-harmutty-tea-estate-400kwp-solar/) [Tea Estates · Multi-Site I&C: **Amalgamated Plantations, Assam: Solar Across Tea Estates**About 5 MW across tea estates (3.8 MWp piled at 11 sites) · Chubwa, Kakajan, Powai, Nonoi, Diffloo, Nahortoli, Naharkatia, Namrup, Borhat and other estates, AssamRead the case study](https://arraysingenieria.com/project-amalgamated-plantations-assam-tea-estates-solar/) [Tea Estates · Ground-Mount I&C: **Rossell India Tea Estates, Assam: Ground-Mount Solar I&C**302 kW, 493.24 kWp, 170.51 kWp and 367 kW · Kharikatia, Nagrijuli, Romai and Dikom Tea Estates, AssamRead the case study](https://arraysingenieria.com/project-rossell-india-assam-tea-estates-solar/) [Industrial · Civil Works: **DCM Textile, Hisar: Civil Works, Piling and I&C for Solar**9979 kWp (10 MW) · Hisar, HaryanaRead the case study](https://arraysingenieria.com/project-dcm-hisar-10mw-solar-civil-works/) [Utility-Scale · Civil & Fencing: **Noida International Airport (YIAPL): 14.36 MW Solar, Piling & Fencing**14.36 MW · Noida International Airport, Gautam Buddh Nagar, Uttar PradeshRead the case study](https://arraysingenieria.com/project-yiapl-14-36mw-solar-civil-fencing/)

Explore More

## Our Other Services

[CAPEX Solar EPC](https://arraysingenieria.com/capex-solar-epc/) [Installation & Commissioning](https://arraysingenieria.com/solar-installation-commissioning/) [Rooftop](https://arraysingenieria.com/service-rooftop/) [EPC Turnkey](https://arraysingenieria.com/service-epc/) [Piling](https://arraysingenieria.com/service-piling/) [Civil & Fencing](https://arraysingenieria.com/service-civil/) [O&M](https://arraysingenieria.com/service-om/) [All Projects →](https://arraysingenieria.com/projects/)