The Chief Minister Cuts the Ribbon at Koomber Solar Plant
The Chief Minister of Assam cuts the ribbon at the 595 kWp Koomber Tea Estate solar plant installed by Arrays Ingenieria. On 1 October 2026 the Chief Minister of Assam, Dr Himanta Biswa Sarma, inaugurated the 595 kWp ground-mounted, on-grid solar power plant at Koomber Tea Estate in Cachar, Assam. Part of the 3.11 MW Goodricke Tea Estates Solar Programme developed by Tata Power Renewable Energy and Sustvest. Arrays Ingenieria (Ingenieria) is an ex-servicemen-led solar EPC and installation MSME.
Filmed at the plant on 1 October 2026. Length: 12 seconds, no sound needed.